CET conducted a comprehensive energy assessment and implemented several upgrades throughout the building. This included installing ductwork across the entire facility, insulating all ductwork associated with three dual furnaces, and installing an air conditioning system with air filtration. Additionally, all the building’s lighting was replaced with energy-efficient LED fixtures in fun, vibrant colors!